Recent Posts
Cost of Limiting Values Calculation Materials
These materials were designed by Phil Clothier to complete a Cost of Limiting Values (Cost of Fear) survey.
Cost Analysis Survey
The Cost Analysis survey is designed to get a feeling for the size of financial loss that the potentially limiting values are placing on an organization. This is particularly effective when members of a group do not think that the PLV’s have any significant meaning. Doing...
IVA and CVA analysis guidance notes
These sheets povide guidance notes to help people analyse the results of an IVA or CVA
Important note: CTT assessment should not be handed over to clients for self analysis without some level of support from a CTT trained consultant.
Objectives
· To see what the profile tells you about these people and their organisation in each of the perspectives (personal values, current culture, and desired...
Cost of Limiting Values setup bvc
Step 1
Step 2a
Step 2b
Step 3
Step 4
Step 5
Step 6
Step 7
Potentially Limitng Values – Survey Data form
Average %
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PLV...
Potentially Limiting Values Surveys Working with PLVs
Cost Analysis Survey
The Cost Analysis survey is designed to get a feeling for the size of financial loss that the potentially limiting values are placing on an organization. This is particularly effective when members of a group do not think that the PLV’s have any significant meaning. Doing a bottom line analysis often gets their attention.
This research into the cost of PLV’s was initiated from...
Presenting CTT Results
Building a Values-Driven Organisation:
A Whole-System Approach to Cultural Transformation
Core Issues for Business
The New Operating Reality
Resilience
Impact of strong adaptive culture
Impact of strong adaptive culture
Research on resilient companies
Financial returns from resilient companies
Balanced Scorecard – Resilient Companies
The Iceberg Balance Sheet
ANZ Bank Australia: Share...
Tags: CTT Results, Presenting CTT
Cultural Values Assessment Analysing Results
Objectives
To see what the profile tells you about these people and their organisation in each of the perspectives (personal values, current culture, and desired culture).
To see if there is alignment between any, some, or all three profiles. And if not, why not?
DOT PLOT
Look at each profile and see what the distribution of dots tells you – predominance at any one level? Blanks...
Individual Values Assessment Analysing Results
Objectives
To see what the profile tells you about this person and the organisation in each of the three perspectives (personal values, current culture, and desired culture).
To see if there is alignment between any, some, or all three profiles. And if not, why not?
Look at each profile and see what the distribution of dots tells you – predominance at any one level? ...





